| Dr.
J. COWLEY CBE BSc PhD
Permanent Representative of the Republic of Vanuatu,
to the International Maritime Organization
Melton House, 21 Stanstead Road,
Caterham, Surrey, CR3 6AD.
Telephone: +44 (0)1883 345774 Fax: +44 (0)1883 341093
-----------------------------------------------------------------------------------------
To: Mr.L.J. Napuati, Commissioner of Maritime Affairs.
cc: Mr. D.J. Sheetz, Deputy Commissioner of Maritime Affairs
Captain K. Barnett, VMC
Mr. T. M. Bayer, Mr. R.M. Bohn, VMS
18 October
2004
IMO
MEETING ON BALLAST WATER MANAGEMENT FOR SHIPS
4TH TO 8TH October 2004
Report
by Dr. J. Cowley
Introduction
This Convention
differs from others of the same status in that it is very
brief and devoid of the detailed provisions necessary for
its implementation. The reason is that the technology for
its implementation has not yet been developed. Consequently,
the Convention refers to the future development of the operating
procedures for approval of substances and methods of reducing
the organisms and pathogens in ballast water discharged from
ships at loading ports.
Since
the agendas of the Marine Environment Protection Committee
are overloaded and as the urgency of finalizing the Guidelines
for the approval of Ballast Water Management Systems is crucial,
the Council instituted this Meeting and also Correspondence
Groups to formulate the regulations.
Explanatory
Note
When considering
this report, it is useful to bear in mind that there are two
distinct standards for Ballast Water discharges as now briefly
indicated:
1. The
standard exemplified by Regulation D1 which covers Ballast
Water Exchange; and
2. The standard exemplified by Regulation D2 which specified
a higher standard based on the number of organisms and pathogens
present in the discharged ballast water which must not be
exceeded.
The two
standards must be met at various times after the entry-into-force
of the Convention according to both the date of construction
of ships and the amount of water ballast that they carry.
The complicated regulations are reproduced in Annex
2 to this paper for convenience. In general, ships will
first meet the regulation D1 standards and, at a later date,
will be required to meet the regulation D2 standards.
A large
number of different methods of treating ballast water in order
to meet the D2 standards are under consideration. In brief,
these include:
Filtration-Mechanical;
Ultraviolet (UV) Radiation; ultrasound; Electro-Ionization;
Magnetic/Electric Field; Biocide; Ozone; Heat; De-Oxygenation
By Vacuum; De-Oxygenation by Venturi Oxygen Stripping; and
De-Oxygenation with Elevated Carbon Dioxide using a Marine
Inert Gas Generator. An outline discussion of their relative
merits is provided at Annex
1.
As a means
of dealing with the problems, a number of Guidelines have
been established, initially designated by the letter “G” as
follows:
G1: Guidelines
for Sediment Reception Facilities;
G2: Guidelines for Sampling of Ballast Water and Analysis
for Port State Control;
G3: Guidelines for Ballast Water Management Systems;
G4: Ballast Water Management Plan Guidelines;
G5: Guidelines for Ballast Water Reception Facilities;
G6: Guidelines for Ballast Water Exchange (Operational);
G7: Guidelines for Risk Assessment;
G8: Guidelines for Approval of Ballast Water Management Systems;
G9: Approval of Active Substances;
G10: Procedure for Approval of Prototype Ballast Water Treatment
Technologies;
G11: Guidelines for Ballast Water Exchange Design and Construction
Standards;
G12: Guidelines for Sediment Control in Ships;
G13: Guidelines for Additional Measures including Emergency
Situations.
At this
Meeting, work continued on the Regulation D-5 Review Procedure
and Guidelines as follows:
As highest
priority to:
.1 finalise
the draft Guidelines for Approval of Ballast Water Management
Systems (G8) with the view to their approval, in principle,
by the Committee.
.2 finalise
the draft Procedures for the Approval of Active Substances
(G9) with the view to their approval, in principle, by the
Committee.
.3 finalise
the “Recommendations for the Conduct of the Review of the
Status of the Ballast Water Management Technologies set by
Regulation D-5 of the Ballast Water Management Convention,
taking into account Conference Resolutions 2 and 4”.
.4 further
develop the guidelines for uniform implementation of the Ballast
Water Management Convention and, in particular, the Guidelines
for Ballast Water Management Plan (G4) and the Guidelines
for Ballast Water Exchange (G6) after completion of items
1, 2 and 3 above.
.5 consider
the remainder of the guidelines.
It was
agreed to discuss principles in the plenary during the extended
working hours (9.00 a.m. - 6.00 p.m. - further extended if
necessary) and to establish small groups to draft the text
for the guidelines outside of the main meeting after the working
hours.
The meeting
agreed to consider G8 and G9 Guidelines and the recommendations
for D-5 review in the plenary, and to attach the agreed text
as annexes to the final report of the meeting to be approved,
in principle, by the Committee.
After an extensive debate regarding shipboard testing, the
meeting agreed that there should not be a final shipboard
testing stage within the type-approval procedure but could
not reach an agreement on a first pre-candidacy shipboard
testing stage and decided to develop the text on this particular
subject in square brackets and seek advice from the Committee
on this matter.
Review of the Procedures for approval of BWMS that
make use of Active Substances (G9)
The use
of Active Substances requires some explanation. These are
chemicals with a short half-life which kill the organisms
in the ballast water and then decay before the ballast is
discharged at the loading port. The intention is that they
are harmless to marine life at the time of discharge.
After the introduction of submitted documents, the meeting
discussed the principles related to the approval of Active
Substances and Ballast Water Management systems using Active
Substances. A number of delegations shared the view that the
process involves two approvals: firstly, IMO gives basic approval
for Active Substances and Preparations; secondly, Final Approval
by the IMO of Ballast Water Management Systems using Active
Substances and Preparations based on information received
from the type testing Administrations. Some delegations were
of the view that G9 guidelines should focus on the environmental
effects of the discharges resulting from the use of Active
Substances. Some delegations expressed concern regarding the
by-products resulting from the use of Active Substances and
Preparations on board ships.
The Working Group agreed to further consideration of the aspects
discussed in the plenary, and thereby established an informal
after-hours group to review the text give its report to the
Plenary on Thursday, 7 October 2004.
After considering the report of the informal group on G9 guidelines,
the meeting conducted a paragraph-by-paragraph review of the
text which was completed on Friday.
Consideration of D-5 review procedure
The meeting considered the Recommendation for the Conduct
of the Review of the Status of the Ballast Water Management
Technologies set by Regulation D-5 of the Ballast Water Management
Convention taking into account Conference Resolutions 2 and
4. submitted documents , and agreed to incorporate a new Section
4 on a template for submissions from Administrations.
Progress on other guidelines
The Working Group further developed the G10 guidelines on
Prototype Technologies based on a draft provided by Norway
and discussed the relation between G8 and G10. Key Issues
for G10 were identified as being less stringent and less prescriptive
as G8. Prototype systems would be a promising technology with
the potential to meet or exceed Regulation D-2.
Extensive discussions took place on G7 guidelines on Risk
Assessment and G4 on Ballast Water Management.
As intended, the Chairman presented an oral report to the
MEPC Plenary session on Monday, 11 October 2004 and received
further instructions for a Working Group to consider in parallel
with the Plenary session.
Further review of the Guidelines for approval of Ballast
Water Management systems (G8)
The final
version of the Draft Procedures for approval of Ballast Water
Management Systems that make use of Active Substances (G9)
is attached at Annex
3.
The remaining guidelines will be further developed intersessionally
and the following focal points will co-ordinate the intersessional
work as follows:
.1 United Kingdom for guidelines (G4), (G6), (G11), (G1),
(G12) and (G5)
.2 Norway
for guidelines (G7), (G10) and (G13)
.3 Germany
for guidelines (G2)
.4 International
Sailing Federation for guidelines (G3)
Concluding
Comments
There
is an immense amount of work still to do on this topic and
much of it will be completed by correspondence.
For convenience,
as all readers will not wish to download Annex 3, this report
is being e-mailed as an attachment and its three Annexes are
being transmitted separately as attachments.
J. Cowley
www.vanuatuships.com
|